The modernization of the power system — on both a national and regional scale — requires more than technological upgrades: it requires new engineering methodologies, demonstrable reliability, and an integrated view of protection, automation, telecommunications, and cybersecurity. With this focus, the annual event organized by CIGRE-Paraguaybrings together professionals to discuss current challenges and explore solutions through real-time testing.
Conprove is participating as an event sponsor.
More information: https://subestaciondigital.cigre.org.py
About the event: focus on digital transformation with technical evidence
The main objective of the event is to present and discuss the challenges of modernization in the power system, connecting real operation and maintenance needs with technological solutions that are already being implemented in the sector.
A relevant differentiator is the proposal to deepen discussions and solutions through real-time testing, creating a technical environment where digital transformation is not only conceptual — it is verifiable.
Digital Substations and IEC standards: what is at the center of the discussion
The event emphasizes the implementation of Digital Substations under the standards:
- IEC 61850
- IEC 61869-9
Within these architectures, critical topics gain priority, especially because they directly impact performance, availability, and operational security.
Key topics: from the bus to time, from traffic to security
The technical agenda highlights the main points of attention in digital substation projects and operation, including:
- Communication networks and their requirements for critical traffic
- Time synchronization and its impacts on digital applications
- Cybersecurity in automation and digital substation environments
- Operation and maintenance of Process Bus and Station Bus
- O&M challenges in a digital transformation scenario that demands updated procedures and criteria
CIGRE Study Committees related to the event
The event is associated with the following CIGRE Study Committees:
- B3
- B5
- D2