Filter by

Testing with GOOSE, SV, and MMS in IEC 61850 Standard

News
Testes-com-GOOSE-SV-e-MMS-na-Norma-IEC-61850.

The Digital Transformation of Substations

The IEC 61850 standard has revolutionized the way devices communicate in substations. Traditional copper wiring has been replaced by digital messages such as GOOSE (Generic Object Oriented Substation Event), Sampled Value (SV), and MMS (Manufacturing Message Specification). This transition ensures greater efficiency, interoperability, and speed in protection and automation systems.

Conprove Solutions for IEC 61850 Testing

Conprove offers complete solutions for testing, commissioning, and analyzing IEDs with full support for the IEC 61850 standard. Our tools allow real-time simulation, monitoring, and verification of digital messages, ensuring secure and reliable operation in modern substations.

Key Benefits of Conprove’s IEC 61850 Testing Tools

 

🚀 With Conprove solutions, engineers and utilities gain access to advanced functionalities, including:

  • Automated and reliable testing for IED validation

  • Latency and message integrity analysis to ensure fast and accurate response

  • Compatibility across multiple manufacturers, guaranteeing interoperability

  • Simulation and diagnosis of critical events in real-time scenarios

Driving Digital Substation Reliability

By adopting Conprove’s advanced test solutions, power utilities and system integrators can validate protection schemes, optimize automation strategies, and ensure compliance with international standards.

🔗 Learn more about IEC 61850 testing with Conprove:

Testing and Monitoring of Communication in Power Systems

Tags (SEO): Conprove, IEC 61850, GOOSE, Sampled Value, MMS, IED testing, digital substations, substation automation, communication testing, power system testing, protection automation control

Post a comment